Heavy/Civil Portfolio

Q&D’s Heavy/Civil group embodies a deep commitment to community stewardship, engaging with the public daily and representing our clients with a friendly approach with a focus on infrastructure projects, including the construction and maintenance of bridges, parks, roads, sewer systems, reservoirs, and more.

The Q&D Way

At Q&D, Heavy/Civil Group is committed to serving as stewards of the community by ensuring that residents, travelers, and local businesses are well-informed and capable of moving seamlessly to their destinations. We carefully consider scheduling, phasing, engineering and material constraints, making the necessary adjustments in order to get the community back to business as quickly as possible.

Highlights

NDOT 3935 Fernley Bridges

This NDOT project in Fernley, NV, along Interstate 80, was the final phase in a series of bridge seismic retrofits. It involved upgrades to eight bridges—four westbound and four eastbound—identified as I-700, I-717, H-844, and I-740. Q&D won the 2025 ENR Northern California Region’s award for Best Highway/Bridge Project  The project was unique for its... Read more »

Truckee Meadows Data Centers

Q&D Construction has played a key role in preparing a $3 billion, 224-megawatt data center development, spanning nearly 137 acres at the Tahoe-Reno Industrial Center (TRIC) east of Reno, Nevada. Q&D has completed much of the grading and earthwork, installing underground utilities, building access roads, and performing concrete work for the campus. The project will... Read more »

NDOT 3935 Fernley Bridges

This NDOT project in Fernley, NV, along Interstate 80, was the final phase in a series of bridge seismic retrofits. It involved upgrades to eight bridges—four westbound and four eastbound—identified as I-700, I-717, H-844, and I-740. The project was unique for its multi-method seismic retrofit approach. Design elements included steel shells for column reinforcement, cast-in-place... Read more »

Reno CONRAC

In 2018, the Reno-Tahoe Airport Authority (RTAA), Conrac Solutions (CS), Avis Budget Group, Enterprise Mobility, and The Hertz Corporation began discussions about the Airport’s identified need for access to an on-airport, centralized location for rental cars and for increased public parking capacity. After a programming analysis, landside study, site selection, and document negotiations, which continued… Read more »

Honey Run Covered Bridge Reconstruction

The historic Honey Run Covered Bridge was located in Butte County, CA but it was reduced to ashes after being destroyed in the November 2018 Camp Fire. Thanks to a massive fundraising effort by the Honey Run Covered Bridge Association, the iconic structure is being rebuilt. Q&D Construction has overseen the first two of three… Read more »

Sparks Nugget Plaza

The Project Q&D Construction’s work on the Nugget Events Center Plaza was entered in the AGC Nevada’s Contractor’s Excellence category for General Engineering projects under $10 million. The plaza is a spot to bring music to your ears and let the tunes put a little pep in your step. Design & Construction Quality The project… Read more »

5 Ridges Master-Planned Community

Contractors Excellence for general engineering contractors on private sector jobs over $10M5 Ridges Housing Development The ongoing development of the 5 Ridges master planned community stakes claim to one of the largest dirt spreads in the Reno-Sparks area. Through the completion of Phase I, Q&D Construction has moved more than 3 million yards of dirt…. Read more »

Lemmon Drive Diverging Diamond Interchange

The Lemmon Drive Segment 1 and Diverging Diamond Interchange Project improves safety and provides additional capacity by widening Lemmon Drive from four to six lanes between Sky Vista Parkway/Buck Drive and Military Road. Multi-modal safety and connectivity were greatly enhanced by adding dedicated bicycle lanes and a separated multi-use path. A continuous raised median eliminates... Read more »

Parr Blvd. Bridge Replacement

NDOT Parr-Dandini Bridge Replacement The Parr/Dandini bridge above US-395 serves as the traffic hub for Truckee Meadows Community College and the Washoe County Sheriff’s Office. A 48-year-old bridge deck combined with the city’s population hikes forced the replacement of the structure to ensure its stability for years to come. This proposed $8 million project by… Read more »

NDOT Spaghetti Bowl Xpress (SBX)

From NDOT: “Known as Spaghetti Bowl Xpress, the first phase of spaghetti bowl renovations will restripe eastbound Interstate 80 lanes between Wells Avenue and the Spaghetti Bowl and widen the eastbound I-80 to southbound I-580 Spaghetti Bowl ramp to two lanes. Auxiliary merge lanes and improved ramps will also be added on southbound I-580 between… Read more »

Contact Us

  • * Required
Load More Projects

What Q&D Project or Service are you looking for?

×
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors