The concrete team built three column/capital and footing specimens for UNR’s bridge design and testing program at their Engineering Earthquake Laboratory. The concrete specimens have some unique geometry; the base of the capital is circular, 3-foot-2-inch-diameter, and slopes inward over 7 inches in height to transition to an 18-inch-square column. After curing, each will be… Read more »
RTC Reno Consolidated 19-02- a $3,182,000 project. The scope includes demolition of existing asphalt concrete, curb and gutter, sidewalk, existing catch basins; earthwork, subgrade preparation, aggregate base, roadbed modification, asphalt concrete, curb and gutter, sidewalk, storm drain, striping, traffic control and utility adjustments. Go team!
We are proud to support Pinocchio’s Annual Mom’s on the Run event! Thank you MOTR for all of the support you give to local cancer research.
Q&D is pleased to honor A/P Supervisor Holly Downing as our honoree for the 2019 Nevada Women’s Fund Women of Achievement event. A 23-year veteran of the construction industry, Holly works hard to maintain order over thousands of invoices a week with her team of three. Since joining Q&D over six years ago, she has… Read more »