RTC Reno Consolidated 19-02- a $3,182,000 project. The scope includes demolition of existing asphalt concrete, curb and gutter, sidewalk, existing catch basins; earthwork, subgrade preparation, aggregate base, roadbed modification, asphalt concrete, curb and gutter, sidewalk, storm drain, striping, traffic control and utility adjustments. Go team!