Retail

A steel-framed building with pre-manufactured insulated metal panels responded closely to the goals of Lindell’s Painting Service. This approach could be built within their budget, featured outstanding insulation, would be easy to maintain and would feature the shortest construction time – less than 6 months. However, the architectural design guidelines of the developer did not allow for “metal buildings.” To better meet the design requirements of a business park , the team used a horizontal installation of smooth metal panels featuring a three-paint color scheme emphasizing the horizontal design. Because the buildings do not appear to be metal, the developer approved the design. With the manufacturer’s cooperation, the team met all of their objectives.

“There was no question when Jerry and I decided to design and build our new shop and office who we wanted to contract with. Q&D Construction is all about customer service, quality and integrity. We are very pleased with our buildings and the quality of workmanship with our limited budget.”

– Sherri Key, Lindell’s Painting Service

SYSTEM HIGHLIGHTS
This award-winning design-build project featured a 3,952 sf office and a 5,760 sf shop using pre-engineered metal clad insulated horizontal panels.

FINISH HIGHLIGHTS
When the budget for Lindell’s Painting Service didn’t allow for a showroom, owners Jerry and Sherri Key chose to install a wide variety of paint and wall covering throughout the facility to illustrate what would normally be in a showroom. Staff member selected paint and wall coverings they admired, resulting in a variety of finishes. In the hallways, Sherri selected a Scuffmaster application with three tones of green with the darkest color as the base. She innovated by selecting a reverse of the same greens with the lightest color as base and separated the finishes with a chair rail.

Load More Projects

What Q&D Project or Service are you looking for?

×
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors