USA Parkway Interchange

The project, an interchange from Interstate 80 to access the Tahoe Reno Industrial Center, features two bridge structures with 11 pre-cast beams that are each 148-feet long. The length is required to span the Truckee River.

The Tahoe Reno Industrial Center developer was sufficiently impressed by Q&D’s efficient and skilled work on USA Parkway, our team was invited to handle a few challenging sitework and utility scopes within the business park.

Q&D’s team is highly skilled in working over waterways, including the Truckee River, one of the most regulated bodies of water in the U.S. It takes careful attention to regulatory constraints as well as true stewardship of this natural resource to ensure 100% compliance.

Project Overview

Location
Reno, NV

Completion Date
June 2008

Designer
HDR Engineering

Delivery Method
Design-Bid-Build

What Q&D Project or Service are you looking for?

×
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors