The project, an interchange from Interstate 80 to access the Tahoe Reno Industrial Center, features two bridge structures with 11 pre-cast beams that are each 148-feet long. The length is required to span the Truckee River.
The Tahoe Reno Industrial Center developer was sufficiently impressed by Q&D’s efficient and skilled work on USA Parkway, our team was invited to handle a few challenging sitework and utility scopes within the business park.
Q&D’s team is highly skilled in working over waterways, including the Truckee River, one of the most regulated bodies of water in the U.S. It takes careful attention to regulatory constraints as well as true stewardship of this natural resource to ensure 100% compliance.
Project Overview
Location
Reno, NV
Completion Date
June 2008
Designer
HDR Engineering
Delivery Method
Design-Bid-Build