Glacier Park International Airport Terminal Expansion

Lacking both a regional identity and experiencing multiple operational challenges, the Glacier Park International Airport (GPI) embarked upon a multi-phase terminal modernization project in 2019. As the gateway to the nearby national park, airport officials pursued a natural palette of wood, metal, stone and glass to reflect the rugged timelessness of the surrounding landscape. Additionally, the local labor market expertise lent itself to installing highly detailed and durable finishes on both the exterior and interior.
The design updated an aging terminal through a contemporary mountain aesthetic inspired by park lodges. Glacier National Park is a prime driver for airport passenger traffic. Backlit steel panels reflecting the natural landscape set the stage for arriving visitors set under a steel, glass and stone canopy. Bringing the outside in, heavy timber trusses supported on multistory stone piers frame views of the surrounding mountains-cape through patterned glass walls. Skylights were strategically located throughout the facility to animate the interior spaces over the course of very disparite seasons. The Great Hall is a mixture of rustic and modern design, setting the stage for the next generation of visitors to the Flathead Valley.
Aligned with a commitment to sustainability and resilience, building systems were designed for efficiency, longevity, and energy reduction. The sustainable design integrates mass timber for reduced carbon footprint, daylighting design to invite more natural light and reduce energy use, ground source cooling for efficient temperature regulation, exterior passenger waiting areas, and a green roof that promotes views to natural environments and stormwater management.
The terminal’s mechanical systems include a geothermal cooling plant with high efficiency water cooled chillers coupled to a network of extraction and reinjection wells and a heating system with high-efficiency condensing boilers. To provide uninterrupted operations, the electrical system is backed by three generators. The plumbing system emphasizes water conservation, and the new technology infrastructure allows for adaptability as the airport grows.
This project not only reimagined the terminal’s future but also allowed Q&D, as well as the entire construction/design team to keep continuous operation during phased construction the top priority. The result is a terminal designed to meet a stronger connection to the region, the highest sustainability standards as well as the evolving needs of the airport and its visitors.
Completed in June 2026 after five years, the finished product brings a level of calm to an environment often associated with high stress. Airport travel is replete with regulatory requirements which can make for sterile environments. The inspiration for GPI was to evoke the classic grand lodges of the park while providing a lounge like experience. With travelers from across the globe, it was critical to provide an experience intuitive to all.

"The team at Q&D brought exceptional expertise and proactive problem-solving to the table, which was critical for the success of this complex airport construction project."

Rob Ratkowski -- Airport Director, Glacier Park International Airport

Project Overview

Location
Kalispell, MT

Completion Date
June 2026

Delivery Method
GMP