Q&D was the earthwork and grading subcontractor to Sedgman USA on this 60-acre mining project to develop Nevada Copper’s Pumpkin Hollow Copper Mine and begin production. Q&D worked closely with Sedgman to evaluate the existing site to ensure accuracy and precision. Our firm provided precise grading and subcontracted liner installation for several ditches, pads and ponds. Work also included clearing and grubbing, earthen platform construction, and HDPE pipe trenching and installation.
Project Overview
Location
Yerington, NV
Designer
Sedgman USA
Delivery Method
Design-Bid-Build