This 4,500-lineal-foot, 18-inch natural gas pipeline project ran parallel to a highly congested arterial road. Coordination with local entities and traffic control allowed the project to be completed in 8 weeks including replacement of asphalt bike path and landscaping. The project included two slick bores under a drainage.
Project Overview
Location
                     Sparks, NV
Client
                     NV Energy
Designer
                     NV Energy
Delivery Method
					 Design-Bid-Build